Factory-direct seating manufacturer  ·  MOQ from 6 pcs · Samples in 7 days · OEM / ODM welcome
Commercial Restaurant Chairs

Why the unit price falls as the order gets larger

MOQ looks like a sales rule. It is really a setup-cost rule, and once you can see which costs, the price ladder stops looking arbitrary — and becomes negotiable.

Published by JPChairs · Chair manufacturer in Foshan, China · 2026-10-13

MOQ is setup cost, not a sales tactic

Every time a line changes model it stops earning. Machine settings change, jigs and bending dies are swapped, upholstery cutting nests are rebuilt, and the first ten frames are inspected more closely than the rest. On a mixed seating line that is 30 to 45 minutes of non-production. On an order of 30 chairs that idle time is spread over 30 units; on 300 it is spread over 300.

The second fixed cost is material minimums. Fabric is dyed and finished in batches, and a cutting marker only becomes efficient above roughly 50 to 100 covers. Powder-coat colour changes mean emptying and cleaning the booth. Below those thresholds the supplier pays a premium on materials and passes it through.

Where the price breaks usually sit

Most factories quote in bands rather than a smooth curve, because the underlying costs step rather than slide:

These are bands, not promises. A complex chair with a bent-plywood shell moves differently from a four-leg solid wood frame.

What actually drives unit cost

Useful split for a mid-range commercial chair:

The lever buyers underestimate is cutting yield. Fabric utilisation that drops five percentage points adds roughly 1.5 to 2 per cent to unit cost, which is why a fabric with a wide repeat pattern costs more to cut even at the same metre price.

Mixing models in one container

Per-model MOQ and per-order MOQ are different things, and conflating them is the most common source of a bad quote.

Mixing three or four models in one container usually lets each model sit at 30 to 50 units, because the container — not the individual model — is the unit the factory plans around. Sharing one fabric or one frame colour across those models pushes it lower still, because the cutting and coating setups are shared.

The trade-off is scheduling complexity: more models means more changeovers and a slightly longer lead time. Two or three models is usually the sweet spot for a first container.

How to get a lower price without losing quality

Ask for the price to come down by changing the spec, not by squeezing the factory — a price cut with no spec change comes back as thinner foam or a lighter finish. These are the trades that cost little in use:

Our own tiering and customisation options are on the OEM customisation programme, and the ranges they apply to are in the commercial restaurant chairs.

Questions buyers ask

FAQ

Why is MOQ quoted per model rather than per order?

Because the setup cost is per model: machine settings, jigs, cutting markers and finishing colour all change between models. Sharing a fabric or finish across models is the cheapest way to lower each model's effective minimum.

Can I mix models to reach the MOQ?

Usually yes. Three or four models in one container can each sit at 30 to 50 units, since the container is what the factory schedules. Expect a slightly longer lead time in exchange.

How much does the unit price drop from 100 to 300 chairs?

Typically 6 to 12 per cent, on top of the 8 to 15 per cent you gain moving from a 30 to 50 unit trial order to 100. The exact figure depends on how much of the cost is material versus setup.