Factory-direct seating manufacturer  ·  MOQ from 6 pcs · Samples in 7 days · OEM / ODM welcome
Iron Chairs

How many spare parts to order with your chairs

Venues that buy 300 chairs will replace parts on 30 to 60 of them inside two years. Packing those parts into the same container costs almost nothing. Shipping them eighteen months later costs more than the part.

Published by JPChairs · Chair manufacturer in Foshan, China · 2026-10-17

What actually fails, in order of frequency

Field requests cluster on four parts. Everything else is rare enough that holding stock for it wastes shelf space.

How much to order per 100 chairs

The quantities below assume a busy restaurant running two sittings a day. Hotels that store banquet seating on trolleys can halve the glide count; a terrace should double it.

Why shipping them later costs twenty times more

The part is cheap. Getting one to you is not.

Photos, batch numbers and the 48-hour claim

Most claims drag on for months because the part cannot be identified. Four habits fix that.

Repair on site, or replace the chair

One simple threshold keeps maintenance decisions from turning into arguments: repair anything that can be fixed in under 15 minutes, replace anything that cannot.

Storing spares so they are usable in year three

Spares degrade faster in bad storage than in service.

Wear parts for the metal frame chairs are stocked to the sizes above, and the restock process is described on the spare parts FAQ.

Questions buyers ask

FAQ

How many spare glides should I order per 100 chairs?

40 to 60, a full set for every five chairs. Nylon glides wear through in 6 to 18 months on hard floors, so order double for terraces and tiled dining rooms.

Do spare parts come free under warranty?

Structural parts yes, for 24 months from the bill of lading date. Consumables such as glides, felt pads and bolt sets are sold at factory cost, typically USD 0.30 to 1.20 each, and are only supplied free if the failure rate exceeds 5 per cent in the first year.

Can I still get matching fabric two years later?

Yes, if you recorded the dye lot number. Allow 15 to 25 days of mill lead time and a 300 to 500 m minimum; without the lot reference a fresh batch lands at Delta E 3.0 to 5.0 and will not match the chairs already in service.