Factory-direct seating manufacturer  ·  MOQ from 6 pcs · Samples in 7 days · OEM / ODM welcome

Your chair, our tooling

Send a drawing, a photo or a physical sample. We sign an NDA, re-engineer the structure for production, and build a prototype in 7–12 days.

Development

From idea to container

A documented six-step process. You approve each stage before we move on, so there are no surprises at shipment.

01

Brief & NDA

Reference photos, dimensions, target price and market. We sign an NDA before any file exchange.

02

CAD & costing

Technical drawing, BOM and EXW / DDP price, with feasibility feedback where a detail drives cost.

03

Prototype

7–12 days in your chosen fabric and finish. Sample fee refunded on the bulk order.

04

Tooling

Bending moulds, jigs and dies opened in-house. Tooling cost refunded once volume is reached.

05

Production

30–35 days with inline QC, pre-shipment report and container loading photos.

06

Repeat orders

Specs and tooling kept on file for 3 years, so re-orders match the original shipment.

Customisation

What you can change

ElementOptionsRemark
FrameSolid oak, beech, ash, bentwood, steel, aluminiumStain, lacquer or powder-coat colour
UpholsteryFabric, velvet, bouclé, PU, genuine leather, COMCustomer-supplied fabric accepted
Foam25–35 kg/m³, high-resilience, memory foamCA TB117 / BS 5852 on request
Legs / baseWood, metal sled, spider, swivel, 4-star, 5-starFelt glides standard
DimensionsSeat height, width, depth, back heightAdjusted to your market's ergonomics
BrandingWoven label, metal plate, embossed logo, hangtagOn seat, back frame or carton
PackagingKD or assembled, 1–2 pcs per cartonArtwork with your SKU and barcode
Showroom

Intellectual property

Your design stays yours

We work under NDA with retailers, Amazon brands and hospitality groups. Your drawings and tooling are never shown to other buyers or listed in our catalogue.

  • NDA signed before development starts
  • Tooling owned by you, stored separately in our tool room
  • OEM models excluded from the public catalogue and showroom
  • Market exclusivity available for committed volumes

QC gates

Four checkpoints per order

Incoming

Materials

Timber moisture, steel gauge, fabric colour fastness and foam density checked before production.

Inline

Structure

Welding, joint tightness and frame squareness inspected on the line.

Final

Finish

Upholstery alignment, coating, hardware and stability checked piece by piece.

Pre-shipment

Documentation

AQL 2.5 sampling, photo report and carton drop-test before container loading.

Start a project

Send us your reference

A photo is enough to begin. Tell us the target price and quantity and we will tell you within 12 hours whether it is feasible — and at what cost.

We reply within 12 hours. Or message us directly on WhatsApp

WhatsApp